
The economic results and the quality of the construction was very high in a result of modern synergy between the companies. The static project’s author was there until the last day at construction site whenever they were needed. This structure is an example of a quality work between the contractor, architecture, project management and the structural engineering firms. These beams are located in the concrete with a special head gear. The beams of the frame are circular spaced steels. The space of the axis in the hypermarket is 10 x 20 meter. The axis of the bearing system is 10 x 10 meter. The frame of the shopping mall is all steel. Except the spaces between the beams, and the frame flooring, the rest of the concrete is prefabricated flooring elements.

The beams and the columns of the bearing system were shedded in the construction site. Above the basement, the three floors have 96 different stores.

To get aspects of the Mediterrean Sea and Beydağ mountains, the seat chart designed specifically. In the basement floor, where hypermarket is located, there are also 8 movie theatre and fast food restaurants located. The two sides of the basement entrance have small pools and cascades. The Shopping Mall also includes 1200 vehicle parking space. The basement floor is limited to 13.000 m2 (140,000 sq-ft). The frame of the shopping mall is related to the hotels and other buildings frames.

Accordingly, the basement floor became the lower ground floor.

The elevation difference between the south and the north is 3.5 meter (11 feet). According to Antalya building regulations, the building is 11 meter (36 feet) high, and the construction site is 50.000 m2. Building site is located in the west of Antalya, 100.YIL Boulevard, and its 85.000 m2 nearby of The Shopping Mall Antalya, there are Glass Pyramid Arts Center, high rise touristic hotels, residential estates, and an amusement park is located.
